At Trans-Acc, our mission, vision, quality policy and objectives are displayed openly as a sign of our pride and commitment, and as a clear reminder of our focus and direction.
Trans-Acc’s quality assurance and inspection processes have been established to document, implement, maintain and improve the performance of our organization. Trans-Acc manages these processes in accordance with the requirements of ISO.
Quality Assurance Capabilities
- ISO: 9001 Quality Management System Certified
Inspection Capabilities
- MIL-DTL-53072 CARC Paint Process Inspection/Tests
- MIL-DTL-5541 CARC Paint (Aluminum) Process Inspection/Tests
- MIL-DTL-81706 CARC Paint (Aluminum) Process Inspection/Tests
- TT-C-490 Clean, Pretreat, Zinc Phosphate Process Inspection/Tests
- MIL-STD-130 ID Marking Inspection
- And Others
Clean, Pretreat, Zinc, and CARC Paint Process Inspection and Tests
- Water Break Testing
- Solvent Wipe Testing
- Visual Workmanship Inspection
- ASTM D4414 Wet (Notch) Film Thickness Inspection
- ASTM B244/499 Dry Film Coating Thickness Testing
- ASTM D3359 Measuring Adhesion by Tape Test
- ASTM B117 Salt Spray (Fog) Testing
- ASTM D610 Evaluating Degree of Rusting and Painted Steel Surfaces
- ASTM D4417 Blast Profile Test